Montrose-BLP Development of Cayley and Shaw Fields
Client: Talisman Energy UK Limited
Provided flow assurance management for FEED, Detailed Engineering and construction for Cayley (a relative HP/HT gas condensate field) and Shaw (a high temperature black oil field) development. Both fields produce to a Bridge Linked Platform and to the Montrose Platform.
Stella Gas & Oil Export Over Fulmar
Client: Talisman Energy UK Limited
Up and Over Conceptual design for gas and oil export to Fulmar.
Auk-North Field Development Thermo-Hydraulic Study
Client: Talisman Energy UK Limited
Performed thermo-hydraulic analysis to confirm flowline size and thermal performance required subject to hydraulic constraints available. As part of the Auk-North field development study, a number of topsides equipment modification and allocation options were considered to assess the performance of the 1st stage separators for each option.
Auk-North Field Development and Dynamic Study
Client: Talisman Energy UK Limited
As part of the Auk-North field development study, a number of topsides equipment modification and allocation options were considered to assess the performance of the 1st stage separators for each option.
Highlander Slug-catcher and Topsides Separation Modification
Client: Talisman Energy UK Limited
Technical screening of a number of subsea and topsides modifications intended for slug control and capacity increase. Job involved construction of a dynamic model to simulate current operations of the Highlander-Tartan subsea production system, benchmarking of the model against current operational data and applying the model to evaluate the impact of the proposed modification on slug mitigation and capacity increased. Active slug control with topsides choking was also investigated.
Curlew Landed Pressure Reduction
Client: Talisman Energy UK Limited
Study evaluated impact of landed pressure reduction on Orion pipeline/riser stability.