A detailed representation of the production system incorporating the well, flowline and topsides process equipment in an integrated dynamic model is developed and applied for system modification assessment, optimisation, de-bottlenecking studies, etc
- Identify production bottlenecks and constraints
- Assess the benefits of new wells, equipment, pipelines, compression, etc.
- Facilitate field development planning
- Determine required response time for HIPPS system
- The options are endless....
Services typically include the following:
- Production system performance evaluation
- Production system diagnostics and debottlenecking
- Asset expansion
- Cost Estimation
- System operability assessment