Client: Gazprom (Russia with SIS)
Performed detailed flow assurance study to assess the technical feasibility of developing the Nemo field which is HP/HT, low GOR waxy reservoir. Analysis examined emulsion effects, thermal management due to the long tieback distances, and wax deposition studies to assess wax deposition rate and develop a wax management strategy.